Squaw Mountain repair 2016-June

Last week (first week of June, 2016), the Squaw Mountain site was left without power following a lightning storm. This took both RMRL repeaters (146.940 and 449.450) off the air, including for the June 6th weekly net. The backup generator failed to start automatically. When commercial power returned two days later, the replacement power company transformer put out 160 VAC instead of the normal 120 VAC and damaged several pieces of equipment at the site. Fortunately, RMRL’s well-designed system prevented the increase in power from taking out any critical or expensive components.

Glenn (WN0EHE) and Dunnigan (K1DUN) made a trip to the site on Sunday, June 12th. It was discovered that a single MOV in the power line filter had blown, thereby interrupting the AC current overload and protecting the rest of the system. We replaced some transient protectors and were back on the air. The 146.940 and 449.450 machines are, once again, fully operational.

Squaw Mountain repeater hit by lightning June 2016
Glenn (WNØEHE) troubleshooting the system on June 12th (2016)
Squaw Mountain lightening strike - replacing a filter
This little AC power line filter had to be replaced.